Thames Tideway Tunnel - C405 Main Works West - KBM Platforms
BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)
Key facts
- Contract value
- £18,810
- Awarded
- 30 Sep 2020
- Contract starts
- 14 Oct 2020
- Contract ends
- 01 Dec 2020
- Procedure
- Open procedure (below threshold)
- Buyer type
- Other public body
Description
The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street.
The geographic layout of the Project and local authorities through which it passes is shown in Figure 1. The Project comprises: a. tunnels: i. a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works ii. 11 connection tunnels, which will link flows from CSOs to the main tunnel. b. Worksites: i. five main tunnel Worksites (drive and/or reception sites) ii. 16 CSO Worksites iii. two System modification Worksites Thames Tideway Tunnel iv. works at Beckton Sewage Treatment works.
Section 4: Scope of Works
Supply a price for manufacture and deliver of :- 2no. - "3310-BMBJV-MNLTA-570-ZZ-DR-000055" KBM LOADING BAY FIXED PLATFORM 2no. - "3310-BMBJV-MNLTA-570-ZZ-DR-000058" - STANDARD ACCESS WALKWAY PLATFORM 1no. - "3310-BMBJV-MNLTA-570-ZZ-DR-000060" - STANDARD ACCESS LADDER PLATFORM
No construction or manufacture should commence until BMB have confirmed approval of drawings. Approved for construction drawings will be issued as soon as they become available.
All deliveries are to be in accordance with the delivery requirements (FORS).
Returned quotations will be evaluated by BMB JV's (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design and engineering teams. Quotations will be evaluated based on; Cost Timeliness of return Adherence to and demonstration of understanding of the drawings and specifications provided at this point. Provision of accurate product specifications to accompany the quotation. Supplier experience of similar projects,evidence of this will be requested should the initial quotation be of interest. Should the candidate supplier be shortlisted they will then be contacted directly by a member of the BMB Procurement Team within two weeks of shortlisting to discuss the requirement in detail. BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) BMB-JV Tideway West, Carnwath Road Riverside, Carnwath Road, London Borough of Hammersmith & Fulham, SW6 3HR
Additional information: BMB-JV Tideway West, Carnwath Road Riverside, Carnwath Road, London Borough of Hammersmith & Fulham, SW6 3HR
Categories (CPV)
- 45262670 Metalworking
Similar open tenders
PLACE1155H Lime Tree Wood (Beeley) Landslip- Repair Works
Location: West MidlandsBuyer: Derbyshire County Council
Open tenderCloses 4 Dec, 202629 daysValue £1.44mSource Find a TenderFor design and construction of a new wall to retain the carriageway, reconstruction of road pavement and highway boundary wall, earthworks reinstatement and associated works Location : Chesterfield Road at OS Grid ref. SK 27586 67431 east of the village of Beeley in Derbyshire (DE4 2NS).
CS6096 School Decarbonisation - Bonner Mile End Main Works Contractor
Location: LondonBuyer: London Borough of Tower Hamlets
Open tenderCloses 30 Nov, 202625 daysValue £1.36mSource Find a TenderThis procurement aims to appoint a main works contractor via an Open Procedure tender to deliver decarbonisation and comfort improvement works at the Grade II listed Primary School, Bonner Mile End, located in Mile End, in the London Borough of Tower Hamlets. The school currently faces significant thermal discomfort -
Perimeter Protection Works_PIP_Beechings Way Playing Fields & Vinalls Park
Location: South EastBuyer: Medway Council
Open tenderCloses 30 Nov, 202625 daysValue £100.00kSource Find a TenderMedway Council (‘The Authority’) invites quotations (Document 3) for the installation of perimeter park protections at Beechings Way and Vinalls Park, Gillingham as detailed in the Specification of Requirement (Document 2) and in accordance with these instructions (Document 1) and the Council’s Terms and Conditions of
Procurement of a Principal Contractor for the Construction of Thameside Academy Alternative Provision Base
Location: East of EnglandBuyer: Thurrock Council
Open tenderCloses 30 Nov, 202625 daysValue £600.00kSource Find a TenderProcurement of a Principal Contractor for the Construction of Thameside Academy Alternative Provision Base. The works comprise two elements: the construction of a new single-storey extension of approximately 33m² to provide a secure entrance foyer, office, accessible WC, meeting room and circulation space; and the inte
Acle Bridge toilet block access, landscaping and drainage improvements
Location: East of EnglandBuyer: Broads Authority
Open tenderCloses 3 Dec, 202628 daysValue £100.00kSource Find a TenderThe Broads Authority is seeking a suitably qualified and experienced contractor to carry out access, landscaping and drainage improvement works at our Acle Bridge toilet block. The works will involve breaking up and removing existing surfacing, raising ground levels, installing new paving and creating sloped access poi
Door Entry Phased Replacement Programme 2026-27
Location: LondonBuyer: London Borough of Hillingdon
Open tenderCloses 2 Dec, 202627 daysValue £200.00kSource Find a TenderThe London Borough of Hillingdon (LBH) intends to install/upgrade the Door Entry/Access Control to 40 low and medium rise blocks. This work will be based on a planned program. The works include, but not limited to the design, supply, installation, commissioning and hand-over of complete and fully functional audio door