Design and Build of workspace, Canner Slipway, Newlyn Harbour
Key facts
- Estimated value
- £1,150,000
- Closing date
- 12 Sep 2018
- Contract starts
- 20 Sep 2018
- Contract ends
- 25 Jun 2021
- Procedure
- Competitive quotation (below threshold)
- Buyer type
- Central government
Description
Newlyn Pier and Harbour Commissioners is seeking to secure the services of a suitably qualified construction firm to design and build workshops in the harbour on a new quayside.
The deadline for responses is: 13:00, Wednesday 12th September 2018.
Newlyn is the largest fishing port in England by fleet and landings. It is located near Penzance in Mounts Bay, South West Cornwall. This Trust Port has a long term programme of development and expansion already underway. These plans address a longstanding shortage of good quality workspace in Newlyn, and quayside workspace in Cornwall, with the construction of industrial workshops, marine engineering infrastructure, food processing facilities and office space.
This contract, along with Lot 4, relates to the "Canner Slipway" project within this programme which is part of the regeneration of the centre of the harbour estate and town.
The Canner Slipway plans are for six to eight sheds of 120m2 on an expanded area of sheet piled, capped quayside with tidal access. The buildings will be steel portal frames suitable for housing marine engineering and fishing operations with the height to accommodate mezzanine offices/storage or gantry crane systems. The current estimate for Canner Slipway, both marine civils and sheds, is £2.5m.
Note: the funding source specifies that all buildings should achieve BREEAM excellent certification and a BREEAM Assessor is in the process of being procured separately to cover all three projects being undertaken (Canner Slipway, New Strand and Canner Car Park) to building certification stage and establish what this requirement will mean for the Canner Slipway element. This project, along with the two others in the programme, Canner Slipway and Canner Car Park are being funded by the Newlyn Pier and Harbour Commissioners, supported by a grant from the European Regional Development Fund (ERDF) under the ESIF Growth Programme for England 2014 to 2020 with the overall cost of all three elements of the scheme estimated at £6,146,308.
Initial designs and costings are available along with site investigations from the immediate area. The timelines for completion of the design and costs for the Canner Slipway workshops is mid October with the build over the following two years. Other build contracts will be issued for the New Strand in November and December of this year.
Additional information: The timelines for the ITT are as follows:
ITT advertised on Contracts Finder: Tuesday 28th August 2018.
Potential bidders are asked to register their interest and request a tender pack by 17.00 3rd September 2018
Tender packs will be sent out from Monday 3rd September.
Bidders to submit questions (if any) regarding ITT by e-mail to the Programme Manager. Responses will be shared with all bidders. Deadline for questions: 17.00 on Friday 7th September 2018. ITT CLOSING DATE AND TIME: 13.00 on Wednesday 12th September 2018. Interviews (if required): Third week of September 2018.
Categories (CPV)
Similar open tenders
Fusion21 Construction & Refurbishment Framework (2027-31)
Location: North WestBuyer: Fusion 21 Foundation
Open tenderCloses 8 Jan, 20272 monthsValue £1.00bnSource Find a TenderFusion21 is establishing a 4-year Construction and Refurbishment Framework. The framework will cover the provision of construction and refurbishment works for participating contracting authorities across the United Kingdom, in accordance with the objectives and requirements of the Procurement Act 2023 (PA23). Prelimina
Supply of Cabins to a holiday rental business in County Carlow
Location: IrelandBuyer: Bilboa Hills Ltd
Open tenderCloses 3 Dec, 202628 daysValue €250.00KSource TEDSupply of 4 Cabins to a glamping enterprise in County Carlow
Donegal County Council - Supply and Delivery of Workshop Tools and Miscellaneous Items
Location: IrelandBuyer: Donegal County Council
Open tenderCloses 2 Dec, 202627 daysValue €60.00KSource TEDSupply and Delivery of Workshop Tools and Miscellaneous Items such as socket sets, wheel alignment gauges, impact wrenches, angle grinders, welding equipment, inspection lamps, wheel removal trolleys, starter packs, trolley jacks and heat torches etc.
Tender 23/2026 - SUPPLY AND DELIVERY OF WORKSHOP TOOLBOXES COMPLETE WITH TOOLS
Location: Northern IrelandBuyer: Newry, Mourne and Down District Council (NMD)
Open tenderCloses 2 Dec, 202627 daysSource Find a TenderNewry, Mourne and Down District Council invite suppliers to tender for the provision of a total of 10 toolboxes complete with tools. This is to equip the workshop personnel with the appropriate tooling to maintain Council vehicles, plant, and equipment to a high standard in line with industry guidelines and statutory r
BBV Sublot 4 - HSST1020 - SALTLEY VIADUCT GABION WALL
Buyer: Balfour Beatty VINCI JV HS2
Open tenderCloses 13 Nov, 20268 daysValue £1.00mSource Contracts FinderOpportunity Summary - Gabion Retaining Wall Works We are seeking experienced suppliers and subcontractors to provide the supply, delivery and installation of a gabion retaining wall system as part of a civil engineering project. Scope of Requirements The successful supplier shall be responsible for: Supply
Supply of EURO Heavyweight and Lightweight Pallets for West Midlands Fire and Rescue Authority 2026 - 2030
Location: United KingdomBuyer: West Midlands Fire and Rescue Authority
Open tenderCloses 4 Dec, 202629 daysValue £250.00kSource Find a TenderWest Midlands Fire and Rescue Authority (the Authority) is seeking to award a Contract for the provision of Euro Heavyweight and Lightweight pallets.