Skip to content
Tenfell
Closed tender
Published 10 Jan 2018

Redisher Wood Bridge Refurbishment 2018, Ramsbottom

Bury Metropolitan Borough Council · North West

Key facts

Estimated value
£70,000
Closing date
02 Feb 2018
Contract starts
12 Mar 2018
Contract ends
20 Apr 2018
Procedure
Open procedure
Buyer type
Local government

Description

Redisherwood Bridge is located in rural area with restricted access off Redisher Lane (off Bolton Road), Ramsbottom and carries Public Footpath No°14 across Holcombe Brook. The Bridge is a single span masonry arch structure with an overall span of approximately 2.8 m and an overall width 1.45m. The works required include (but are not restricted to): • Site clearance (including saplings and trees within 5m of bridge superstructure and training walls). • The taking up/down of masonry training walls and rebuilding along existing lines with a maximum retaining height of 2.1m. • The taking up/down/repair spandrel walls. • Construction of squared random rubble stone parapets to bridge • Provision of timber parapets to training walls • Masonry repairs, pointing and pressure grouting of existing abutments and arch ring. • Working at heights of up to 2.1m above, in and about, and adjacent to a watercourse (Classed as main river by the Environment Agency)

Categories (CPV)

Similar open tenders

About Bury Metropolitan Borough Council

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Published by the buyer on Contracts Finder archive (Open Contracting) (Open Government Licence v3.0). Always read the original notice before responding.