RSSB2746 - T1147 - The Health, Wellbeing and Safety Effects of Crowding on trains and in stations
Key facts
- Estimated value
- £45,000
- Closing date
- 16 Nov 2018
- Contract starts
- 10 Dec 2018
- Contract ends
- 29 Mar 2019
- Procedure
- Open procedure (below threshold)
- Buyer type
- Utilities & transport
Description
Over the last decade the number of rail passenger journeys in Great Britain has grown by approximately 70%. In 2016-17 there were 1.71 billion passenger journeys and it is expected that demand will double in the next 25 years . Despite increases in carrying capacity on the railways, overcrowding has been an issue of concern for some years, both on trains and in stations, and has been prominent in news reports about Southern Rail, Northern Rail (in relation to problems associated with the timetable changes in 2018) and the maintenance works at London Bridge station. RSSB study T307 (2005) concluded that "there was very little direct evidence of the health effects of crowding", a position reflected in the ORR's (2005) health and safety policy on train crowding. However, this policy does not cover other aspects of crowding at stations or at the platform/train interface. On an initial analysis of SMIS data, RSSB study T605 (2009) estimated that crowding contributed to 1.4% of on-train risk and 0.5% of on-station risk, equating to approximately 0.4 Fatalities and Weighted Injuries (FWI) per year. However, there was considerable uncertainty around this estimate, because crowding is sometimes a contributory cause of an accident rather than the reported cause. Workshop discussions indicated that the FWI from crowding could be as high as 1.5 per year. Further analysis of SMIS data, together with input from the workshops, led to an adjusted estimated FWI figure of 0.5 per year. In addition, T605 concluded that there was no evidence that on-train crowding increased (or decreased) the risk from major train accidents (derailments or collisions). Subsequent to this previous research, acute crowding incidents such as those seen at London Bridge have led to many complaints from the public, some referring to the perceived health impacts of crowding. The ORR has therefore felt it is necessary to respond to these concerns, especially given the prospect of further increases in passenger numbers. A 2015 meeting on crowd management, hosted by the ORR, led to four undergraduate human factors students undertaking knowledge searches that are intended to help update existing advice. The final report (T1106) is expected to be available on www.sparkrail.org. In addition, the Royal Society for Public Health has linked commuting with reduced mental wellbeing, poorer physical health as a result of raised blood pressure and less time available for physical activity. Their survey of passengers revealed overcrowding and delays to be two of the main factors perceived to negatively impact perceived health and wellbeing. In the context of these recent concerns, this project is intended to extend the earlier RSSB guidance and enable the ORR to update its policy position on crowding.
Categories (CPV)
Similar open tenders
PRO005166 - ORiW - Design and Integration Partner
Location: North WestBuyer: United Utilities Water Limited
Open tenderCloses 30 Nov, 202625 daysValue £600.00mSource Find a TenderThis notice relates to tender activity for the provision of certain design and integration services, as explained below. United Utilities Water Limited (UU) proposes to deliver a programme titled Only Rainwater into Windermere (ORiW), with the ambition to make Windermere the cleanest lake in England by removing dischar
PLACE1155H Lime Tree Wood (Beeley) Landslip- Repair Works
Location: West MidlandsBuyer: Derbyshire County Council
Open tenderCloses 5 Dec, 202630 daysValue £1.44mSource Find a TenderFor design and construction of a new wall to retain the carriageway, reconstruction of road pavement and highway boundary wall, earthworks reinstatement and associated works Location : Chesterfield Road at OS Grid ref. SK 27586 67431 east of the village of Beeley in Derbyshire (DE4 2NS).
Fusion21 Construction & Refurbishment Framework (2027-31)
Location: North WestBuyer: Fusion 21 Foundation
Open tenderCloses 8 Jan, 20272 monthsValue £1.00bnSource Find a TenderFusion21 is establishing a 4-year Construction and Refurbishment Framework. The framework will cover the provision of construction and refurbishment works for participating contracting authorities across the United Kingdom, in accordance with the objectives and requirements of the Procurement Act 2023 (PA23). Prelimina
LW195 QUP IMP Support - Castlevax
Location: North WestBuyer: Liverpool School of Tropical Medicine
Open tenderCloses 30 Nov, 202625 daysValue £100.00kSource Find a TenderLSTM is seeking to appoint a suitably qualified and authorised supplier to provide Qualified Person (QP) services and associated GMP, regulatory, importation, labelling and clinical trial supply services for the COVAXCHIM002 Phase 2b clinical trial, taking place in the UK, Belgium and Singapore. For more information ab
Condition Survey Programme Various Sites
Location: North WestBuyer: St Helens Council
Open tenderCloses 26 Nov, 202621 daysValue £100.00kSource Find a TenderSt Helens Council is seeking to appoint a suitably qualified contractor for the Condition Survey Programme Various Sites For a full specification for this opportunity, please register you interest. Please note that this opportunity is being ran as an open restricted tender, open to the businesses based within the follo
Footways Maintenance Survey (Lot 3) (2027)
Location: South EastBuyer: West Sussex County Council
Open tenderCloses 16 Nov, 202611 daysValue £60.00kSource Find a TenderWest Sussex County Council are seeking to and identify suitably qualified and interested organisations to obtain road condition data for the highway network for footways and remote cycleways during 2027.