Skip to content
Tenfell
Awarded contract
Published 09 Mar 2018

A Model of GB Electricity Distribution Network Costs

Business Energy and Industrial Strategy · United Kingdom

Key facts

Contract value
£49,990
Awarded
19 Jan 2018
Contract starts
22 Jan 2018
Contract ends
16 Apr 2018
Procedure
Open procedure (below threshold)
Buyer type
Utilities & transport

Awarded to

SupplierValue
TNEI Services Ltd£49,990

Description

BEIS wishes to commission a robust, representative and user-friendly model of GB electricity distribution network costs to be used in-house alongside or within the Department's existing GB electricity market modelling capability. A model manual, an assumptions and QA log and detailed teach-in sessions of the model are required.

Description: The model BEIS wishes to commission must output GB distribution network reinforcement costs associated with different peak demand (or peak distributed generation) scenarios driven by general electricity demand and different technology/intervention uptake on the demand and supply side. The model must allow the assessment of different volumes, timings, geographical spread and clustering within networks of general demand and the different types of technology/intervention uptake. It must be able to assess changes in reinforcement costs due to different solution types (conventional and non-conventional), different Distribution Network Operators (DNOs) foresight or investment strategies.

In addition to the specific model requirements, BEIS requires a model manual (which should be both a technical user guide and a self-learning training guide), an assumptions and QA log and detailed teach-in sessions on the model.

Additional information: How to Apply:

If you wish to take part in this procurement, please see the attached Tender documents attached to this Notice and send your completed Proposal to Birgit Wosnitza and Nazish Choudery at the e-mail addresses stipulated in the "Who to Contact" section and below.

Any late submissions will not be considered. BEIS reserves the right to halt the procurement process and to not award a contract. BEIS will not be held liable for recovery of costs from unsuccessful bids if a contract is not awarded. All costs will be borne by the bidding organisations. If a contract is created it will be upon BEIS Standard Terms and Conditions which are available on Contracts Finder with this notice.

Completed tender submissions must be returned by e-mail to BEIS, to the e-mail addresses given in this advertisement ([email protected] and [email protected]), by 11am on 21st December 2017. After reviewing and evaluating the written proposals, BEIS may decide to hold bid clarification meetings with suppliers. If successful and upon contract signature, the supplier is expected to attend a kick-off meeting taking place on 12th January 2018 (or shortly thereafter). Project completion is required by April 2018.

Categories (CPV)

Similar open tenders

  • Fuel Supply Framework

    Location: West MidlandsBuyer: Lichfield District Council

    Open tenderCloses 4 Dec, 202629 daysValue £3.20mSource Find a Tender

    Lichfield District Council are looking to establish a multi supplier, closed framework, for the supply of Road Derv (White Diesel) for the Joint Waste Service fleet of vehicles.

  • Design, Supply, Installation and Commissioning of a Roof-Mounted Solar Photovoltaic (PV) System at The Enterprise Centre, Farnham

    Location: South EastBuyer: Waverley Borough Council

    Open tenderCloses 30 Nov, 202625 daysValue £78.00kSource Find a Tender

    Guildford Borough Council is seeking to appoint a suitably qualified and experienced contractor to design, supply, install, test and commission a roof-mounted Solar Photovoltaic (PV) system at The Enterprise Centre, Farnham. The project forms part of the Council's commitment to reducing carbon emissions, improving ener

  • Saltash Guildhall Internal Works

    Buyer: Saltash Town Council

    Open tenderCloses 30 Nov, 202625 daysSource Contracts Finder

    Saltash Town Council is seeking tenders from suitably qualified contractors for internal remodelling works at the Guildhall, Lower Fore Street, Saltash. The project comprises refurbishment and adaptation works to support revised council operations and meeting functions, including: Manufacture and installation of besp

  • Construction, Repairs and Maintenance Framework

    Location: Yorkshire and the HumberBuyer: North Lincolnshire Council

    Open tenderCloses 30 Nov, 202625 daysValue £62.40mSource Find a Tender

    North Lincolnshire Council is establishing a series of Frameworks to provide flexible, compliant and commercially robust mechanisms for the delivery of construction, maintenance, repair and infrastructure services across its estate and wider asset portfolio

  • WHC - Electrical minor works.

    Location: East of EnglandBuyer: Welwyn Hatfield Borough Council

    Open tenderCloses 11 Dec, 202636 daysValue £1.15mSource Find a Tender

    Welwyn Hatfield Borough Council (The Council) is inviting tenders for electrical service maintenance and minor works to its corporate property portfolio in accordance with these instructions and terms and conditions of contract. The works covered by this contract comprise of miscellaneous Electrical Servicing and Mino

  • Schools Energy Pathfinder 2025 - Biomass Programme - Biomass Package - Bundle 1 (MSLETB)

    Location: IrelandBuyer: Mayo Sligo and Leitrim ETB

    Open tenderCloses 20 Nov, 202615 daysValue €4.55MSource TED

    Invitation to Tenders is sought from suitably qualified Contractors to undertake the complete Project Scope comprising of supply, delivery, installation and commissioning of modular off-site constructed containerised biomass cabins and the subsequent supply and delivery of fuel to each school for a period of 15 years.

About Business Energy and Industrial Strategy

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Published by the buyer on Contracts Finder archive (Open Contracting) (Open Government Licence v3.0). Always read the original notice before responding.