RSSB2726 - T1143 Devices to guide derailed trains - Invitation To Tender

RAIL SAFETY AND STANDARDS BOARD LIMITED · London

Key facts

Estimated value
£140,000
Closing date
07 Dec 2018
Contract starts
09 Jan 2019
Contract ends
30 Sep 2019
Procedure
Open procedure (below threshold)
Buyer type
Utilities & transport

Description

1.Background RAIB have noted a sequence of derailment incidents over many years where the lateral excursion of the lead vehicle has been limited by engagement between vehicle and track features that were not intended for that purpose. The most recent of these was in September 2016 at Watford Junction where the right-hand rail engaged between the traction motor and gearbox housings of the derailed vehicle and limited the deviation from the track and as a consequence reduced the severity of the impact with an oncoming vehicle. RAIB have made recommendations to consider the use of mechanical devices or structures to guide derailed trains with the latest recommendation in recommendation 3 of the Watford report:

"3. The intent of this recommendation is to identify and assess the effectiveness of design features that provide guidance to trains when derailed, so limiting the deviation of trains from the track and reducing the risk of collision with trains approaching on other lines. This could be achieved by the retention or strengthening of features already forming part of the bogie structure, or infrastructure measures such as guard rails. It is also intended that the learning from research in this area is used to derive meaningful design requirements. The Rail Delivery Group (RDG), in conjunction with RSSB, should: a. commission research into the ways in which guidance can be provided to derailed trains. This should include consideration of: I. how the design of bogies and bogie mounted equipment can assist in limiting the lateral deviation of passenger trains during a derailment; II. practice in other countries (eg Japan); III. how specially installed infrastructure features can achieve the same effect at high risk locations; IV. potential design requirements for the retention or enhancement of such features on new trains or infrastructure; and V. the potential benefits and drawbacks of such measures. If such features, whether existing or additional, are shown to have a net beneficial effect in reducing risk by limiting lateral deviation, RDG/RSSB should: b. share this information with the relevant Standards Committees; and c. record and disseminate the design requirements with a view to their incorporation into future standards."

Previous similar recommendations made have been reviewed by industry through the Rolling Stock Standards Committee and concluded that such devices were unlikely to be practical or effective. The purpose of this study is to provide a broader, more comprehensive study with objective outputs to provide a definitive position on derailment mitigation.

Categories (CPV)

Similar open tenders

About RAIL SAFETY AND STANDARDS BOARD LIMITED

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Published by the buyer on Contracts Finder archive (Open Contracting) (Open Government Licence v3.0). Always read the original notice before responding.