- Estimated value
- £70,000
- Closing date
- 11 Jun 2018
- Contract starts
- 24 Jun 2018
- Contract ends
- 03 Sep 2018
- Procedure
- Open procedure (below threshold)
- Buyer type
- Education
Description
Tenders are invited from interested parties for the Supply, Installation and Commissioning of a 1 MvA 11kV - 0.4kV Sub-Station on Phase 3, Plot 6 to supply the new Smart Innovation Hub building located on Phase 3, Plot 2 of the University campus in accordance with the Tender Specification in Section 2 of the ITT.
The Smart Innovation Hub is part funded by the European Regional Development Fund (ERDF) as part of the European Structural and Investment Funds England Growth Programme 2014-2020, Staffordshire County Council, the University of Keele and the Department for Business, Energy and Industrial Strategy (BEIS) Single Local Growth Fund. The Smart Innovation Hub Sub-Station is also part funded by ERDF.
Given the need for one Contractor to co-ordinate the delivery of all of the works required, the contract has not been divided into lots.
The Contractor shall complete all of the contract requirements detailed in the Tender Specification in Section 2 of the ITT and ensure that the Smart Innovation Hub Sub-Station has been fully installed and commissioned by 3rd September 2018.
The estimated total value of the contract is £70,000 excluding VAT.
It is essential that Tenderers visit the University campus prior to submitting their tender submission in order to ascertain all the necessary information as to risk which may affect their tender sum.
Arrangements to visit site for this contract can be made directly with Mr Ashley Hulme, Tel: 01782 733135. The site visits will be conducted during the tender period.
The Contracting Authority for this procurement is Keele University Science and Business Park Ltd (KUSBPL).
Additional information: The procurement documents are available for unrestricted and full direct access, free of charge, at: https://in-tendhost.co.uk/universityofkeele/aspx/Home
Tenders or requests to participate must be submitted electronically via: https://in-tendhost.co.uk/universityofkeele/aspx/Home
Tenderers remain responsible for all costs and expenses incurred by them or by any third party acting under instructions from the Tenderer in connection with taking part in this procurement, regardless of whether such costs arise as a direct or indirect consequence of any amendments made to the procurement documents by KUSBPL at any time.
The Smart Innovation Hub is part funded by the European Regional Development Fund (ERDF) as part of the European Structural and Investment Funds England Growth Programme 2014-2020, Staffordshire County Council, the University of Keele and the Department for Business, Energy and Industrial Strategy (BEIS) Single Local Growth Fund. The Smart Innovation Hub Sub-Station is also part funded by ERDF.
Funding Type (WEFO or EU) : EU
Funding Description
Part-funded from the European Regional Development Fund (ERDF) as part of the European Structural and Investment Funds England Growth Programme 2014-2020.
Is a Recurrent Procurement Type? : No
Categories (CPV)
Similar open tenders
PLACE1155H Lime Tree Wood (Beeley) Landslip- Repair Works
Location: West MidlandsBuyer: Derbyshire County Council
Open tenderCloses 5 Dec, 202630 daysValue £1.44mSource Find a TenderFor design and construction of a new wall to retain the carriageway, reconstruction of road pavement and highway boundary wall, earthworks reinstatement and associated works Location : Chesterfield Road at OS Grid ref. SK 27586 67431 east of the village of Beeley in Derbyshire (DE4 2NS).
Fusion21 Construction & Refurbishment Framework (2027-31)
Location: North WestBuyer: Fusion 21 Foundation
Open tenderCloses 8 Jan, 20272 monthsValue £1.00bnSource Find a TenderFusion21 is establishing a 4-year Construction and Refurbishment Framework. The framework will cover the provision of construction and refurbishment works for participating contracting authorities across the United Kingdom, in accordance with the objectives and requirements of the Procurement Act 2023 (PA23). Prelimina
Frimley Lodge Car Park Project
Location: South EastBuyer: Surrey Heath Borough Council
Open tenderCloses 8 Dec, 202633 daysValue £1.21mSource Find a TenderFrimley Lodge Car Park Project - reconstruction of the Main Car Park and Main Access Road, resurfacing of Main Entrance Road; includes new drainage, signage, lighting and power for 2 no. electric vehicle charging points (EVCP) and the infrastructure ducting only for the possible future expansion of EVCPs and CCTV provi
CS6096 School Decarbonisation - Bonner Mile End Main Works Contractor
Location: LondonBuyer: London Borough of Tower Hamlets
Open tenderCloses 30 Nov, 202625 daysValue £1.36mSource Find a TenderThis procurement aims to appoint a main works contractor via an Open Procedure tender to deliver decarbonisation and comfort improvement works at the Grade II listed Primary School, Bonner Mile End, located in Mile End, in the London Borough of Tower Hamlets. The school currently faces significant thermal discomfort -
Perimeter Protection Works_PIP_Beechings Way Playing Fields & Vinalls Park
Location: South EastBuyer: Medway Council
Open tenderCloses 30 Nov, 202625 daysValue £100.00kSource Find a TenderMedway Council (‘The Authority’) invites quotations (Document 3) for the installation of perimeter park protections at Beechings Way and Vinalls Park, Gillingham as detailed in the Specification of Requirement (Document 2) and in accordance with these instructions (Document 1) and the Council’s Terms and Conditions of
Procurement of a Principal Contractor for the Construction of Thameside Academy Alternative Provision Base
Location: East of EnglandBuyer: Thurrock Council
Open tenderCloses 30 Nov, 202625 daysValue £600.00kSource Find a TenderProcurement of a Principal Contractor for the Construction of Thameside Academy Alternative Provision Base. The works comprise two elements: the construction of a new single-storey extension of approximately 33m² to provide a secure entrance foyer, office, accessible WC, meeting room and circulation space; and the inte