Closed tender
Published 02 Oct 2018

Pyrolysis Auger Reactor Prototype Fabrication

PYROGENESYS LTD

Key facts

Estimated value
£50,000
Closing date
16 Oct 2018
Contract starts
08 Nov 2018
Contract ends
08 May 2019
Procedure
Call-off from a framework agreement (framework)
Buyer type
Other public body

Description

The purpose of the project is to build a fully operational prototype self-powered, 50 kg/h (continuous process) waste biomass heater system.

The equipment must be designed and built to operate safely when processing corrosive and abrasive biomass materials, at temperatures up to 600 DegC.

Additional information: Breakdown of work to be tendered for: 1. Engineering design and analysis, before designing and building the system. 2. Mass and energy balance. 3. Design modification and optimisation. 4. HAZOP 5. Prototype fabrication. 6. Instrumentation and control system. 7. CE Marking. 8. On-site installation 9. Commissioning

Categories (CPV)

Similar open tenders

About PYROGENESYS LTD

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Published by the buyer on Contracts Finder archive (Open Contracting) (Open Government Licence v3.0). Always read the original notice before responding.