Weighbridge upgrades for digital waste tracking at Warwickshire Household Waste Recycling Centres (HWRCs)
Warwickshire County Council · West Midlands
Key facts
- Contract value
- £396,845
- Awarded
- 06 Aug 2026
- Contract starts
- 31 Aug 2026
- Contract ends
- 31 Dec 2035
- Procedure
- Direct award
- Buyer type
- Local government
- Source
- Find a Tender
Awarded to
| Supplier | Value |
|---|---|
| Weightron Bilanciai Limited | £396,845 |
Description
Warwickshire County Council is a Waste Disposal Authority, responsible for arranging the disposal of municipal waste collected within the county and for providing Household Waste Recycling Centres (HWRCs). Four of the Council-operated HWRCs (Lower House Farm, Princes Drive, Hunters Lane, and Burton Farm) have weighbridges. The weighbridges play a critical role in ensuring the compliant management of municipal waste across Warwickshire. The weighbridges enable the accurate measurement of waste loads from a wide range of vehicles, waste types, and stakeholders. They also support the provision of waste transfer documentation, ensuring legal compliance. The current weighbridge infrastructure supplied by Weightron has been in place since at least 2011 following the Council's takeover of HWRC operations and has been consistently supported by Weightron since that time. The proposed works will be delivered through a single supplier arrangement with Weightron, as the current provider of the Council's weighbridge infrastructure and software. The works relate to the Council's statutory responsibilities as a Waste Disposal Authority, including the operation of HWRCs and the compliant management of municipal waste. The weighbridge service is currently operating effectively, however there is a new requirement to implement Digital Waste Tracking as mandated by DEFRA. The Government's intention is for this system to replace paper-based waste transfer documentation with a single, centralised digital platform for recording all waste movements helping to improve traceability and reduce waste crime. From October 2026 it becomes mandatory for all permitted waste receiving sites to submit information about the commercial waste they receive onto DEFRA's new digital waste tracking system. This includes the HWRCs operated by the Council. There will be a second phase to DEFRA's digital waste tracking project from October 2027. This contract covers implementation (including setup/configuration), software development and annual subscriptions for the contract lifespan for both phases. In order to comply with digital waste tracking requirements, Weightron must carry out works to ensure that all required waste receipt information is captured through the weighbridge system and automatically reported to the national digital waste tracking service. There is a current contract in place for the weighbridges which includes servicing, maintaining, upgrading, and repairing the weighbridge equipment and hardware systems as well as providing software support. The total term of this contract is 10 years however, this is reviewed annually and 3 months' notice can be given to end the agreement. Weightron currently provides all of this service. The existing provision and the new digital waste tracking requirements must be delivered by the same supplier to ensure full integration with the existing weighbridge infrastructure and hardware.
Categories (CPV)
- 90500000 Refuse and waste related services
Similar open tenders
Bat Advice Service (2027)
Location: LondonBuyer: NATURAL ENGLAND
Open tenderCloses 1 Dec, 202626 daysValue £748.92kSource Find a TenderBats and their roosts are protected under Section 9 of the Wildlife and Countryside Act 1981 (as amended) and regulation 43 of the Conservation of Habitats and Species Regulations 2017 (as amended) The Conservation of Habitats and Species Regulations 2017. The legislation places obligations on both individuals and publ
Provision of Water Framework Directive (WFD) Related Services 2027 and 2028-2030 Inclusive
Location: IrelandBuyer: Waterways Ireland
Open tenderCloses 11 Dec, 202636 daysValue €390.00KSource TEDThe Water Framework Directive (WFD), Directive 2000/60/EC, was adopted in 2000 as a single piece of legislation covering rivers, lakes, groundwater and transitional (estuarine) and coastal waters. Its objectives include the attainment of good status in water bodies that are of lesser status at present and retaining goo
FCC/234/26 Establish a Multi Party Framework Agreement for Environmental Monitoring and Consultancy Work for Balleally and Dunsink Landfills with an Initial Contract for Fingal County Council
Location: IrelandBuyer: Fingal County Council
Open tenderCloses 8 Dec, 202633 daysValue €2.00MSource TEDEstablish a Multi Party Framework Agreement for Environmental Monitoring and Consultancy Work for Balleally and Dunsink Landfills with an Initial Contract for Fingal County Council
Management and Operation of Six Civic Amenity /Recycling Centres at Carndonagh, Dungloe, Laghey, Letterkenny, Milford and Stranorlar in County Donegal
Location: IrelandBuyer: Donegal County Council
Open tenderCloses 27 Nov, 202622 daysValue €1.40MSource TEDThe Operation and Management of 6 no Civic Amenity Sites concurrently at Carndonagh, Dungloe, Laghey, Letterkenny, Milford and Stranorlar. The services will generally comprise of - Handling and processing waste streams. - Monitoring and reporting (data collection, AERs etc). - Management systems and proven staff experi
Westgate Vision 2040 - Multi-Disciplinary Design Team (MDDT) Consultancy Service
Location: IrelandBuyer: Louth County Council
Open tenderCloses 25 Nov, 202620 daysValue €900.00KSource TEDDelivery of detailed design, tender and management of construction phase to handover for Westgate Vision Public Realm Scheme Character Area 1 and 2
North Northamptonshire Council - Operation & maintenance of landfill gas and leachate management systems at Corby closed landfill site
Location: East MidlandsBuyer: North Northamptonshire Council
Open tenderCloses 2 Dec, 202627 daysValue £273.00kSource Find a TenderCorby Closed Landfill is located on the northern outskirts of Corby. The landfill covers approximately thirteen (13) hectares. The volume of waste deposited into the site is unknown but is estimated to be in the order of 1.4Mm3 to a depth of around sixteen (16) metres. The buried waste produces landfill gas and leachat