Sizewell C - HR Monitoring (CRX & Building) Package
Key facts
- Estimated value
- £5,000,000
- Closing date
- 10 Apr 2026
- Contract starts
- 30 Oct 2028
- Contract ends
- 04 Mar 2030
- Buyer type
- Other public body
- Source
- Contracts Finder
Description
Overview of Scope
Supply and installation of the HR Monitoring System to the to CRX and Nuclear Island Building
The EAU (containment monitoring) system is required to continuously monitor and assess the mechanical behaviour and integrity of the Reactor Building and integrity of the Reactor Building and associated at nuclear island at Sizewell C (SZC) throughout construction, testing, and operation. The system scope covers the design, supply, installation, commissioning, and documentation of: • Monitoring sensors (including extensometers, temperature probes, hydraulic levelling pots, pendulums, invar wires, inclinometers, hygrometers, and pressure sensors) • Associated cabling, connection/grouping boxes, and acquisition/data logger cabinets • All necessary software interfaces and data collection/reporting tools More than 200 sensors will be embedded and installed in both the inner containment wall and the common raft of the nuclear island. The EAU monitoring system must provide real-time and periodic data on: • Settlements and deformations of the nuclear island raft (topographical markers, hydraulic levelling pots, extensometers, and temperature sensors) • Overall containment distortions (pendulums and invar wires) • Localized deformations and tendon failure detection (embedded extensometers, local monitoring devices) • Tension in prestressed cables (dynamometers) • Environmental parameters (temperature, humidity, internal and external pressure) All EAU system components must comply with the Book of Technical Specifications (BTS) Chapter 9.04 and associated referenced as well as client installation and interface requirements. Instruments must be delivered with calibration certificates and installed in accordance with manufacturer and project-specific procedures. The EAU system contractor will also provide: • Installation studies and execution drawings for all phases (temporary/erection and permanent/operational) • Material Approval Forms, Inspection and Test Plans, Quality Release Certificates, and Lifetime Quality Records (LTQR) • Data collection, reporting formats, and periodic analysis files as required by the client (monthly/bi-monthly during construction; weekly/daily during key phases; and as specified during operation)
Additional information: It will be beneficial for you to describe your business as much as possible and highlight where you can help us to achieve our values described above
Categories (CPV)
- 71311000 Civil engineering consultancy services
- 71320000 Engineering design services
- 71332000 Geotechnical engineering services
- 71631400 Technical inspection services of engineering structures
- 71700000 Monitoring and control services
- 71313000 Environmental engineering consultancy services
- 45220000 Engineering works and construction works
- 38434400 Vibration analysers
- 71312000 Structural engineering consultancy services
- 71321000 Engineering design services for mechanical and electrical installations for buildings
- 71335000 Engineering studies
- 71322000 Engineering design services for the construction of civil engineering works
Similar open tenders
PRO005166 - ORiW - Design and Integration Partner
Location: North WestBuyer: United Utilities Water Limited
Open tenderCloses 30 Nov, 202625 daysValue £600.00mSource Find a TenderThis notice relates to tender activity for the provision of certain design and integration services, as explained below. United Utilities Water Limited (UU) proposes to deliver a programme titled Only Rainwater into Windermere (ORiW), with the ambition to make Windermere the cleanest lake in England by removing dischar
PLACE1155H Lime Tree Wood (Beeley) Landslip- Repair Works
Location: West MidlandsBuyer: Derbyshire County Council
Open tenderCloses 5 Dec, 202630 daysValue £1.44mSource Find a TenderFor design and construction of a new wall to retain the carriageway, reconstruction of road pavement and highway boundary wall, earthworks reinstatement and associated works Location : Chesterfield Road at OS Grid ref. SK 27586 67431 east of the village of Beeley in Derbyshire (DE4 2NS).
Fusion21 Construction & Refurbishment Framework (2027-31)
Location: North WestBuyer: Fusion 21 Foundation
Open tenderCloses 8 Jan, 20272 monthsValue £1.00bnSource Find a TenderFusion21 is establishing a 4-year Construction and Refurbishment Framework. The framework will cover the provision of construction and refurbishment works for participating contracting authorities across the United Kingdom, in accordance with the objectives and requirements of the Procurement Act 2023 (PA23). Prelimina
LW195 QUP IMP Support - Castlevax
Location: North WestBuyer: Liverpool School of Tropical Medicine
Open tenderCloses 30 Nov, 202625 daysValue £100.00kSource Find a TenderLSTM is seeking to appoint a suitably qualified and authorised supplier to provide Qualified Person (QP) services and associated GMP, regulatory, importation, labelling and clinical trial supply services for the COVAXCHIM002 Phase 2b clinical trial, taking place in the UK, Belgium and Singapore. For more information ab
Condition Survey Programme Various Sites
Location: North WestBuyer: St Helens Council
Open tenderCloses 26 Nov, 202621 daysValue £100.00kSource Find a TenderSt Helens Council is seeking to appoint a suitably qualified contractor for the Condition Survey Programme Various Sites For a full specification for this opportunity, please register you interest. Please note that this opportunity is being ran as an open restricted tender, open to the businesses based within the follo
Footways Maintenance Survey (Lot 3) (2027)
Location: South EastBuyer: West Sussex County Council
Open tenderCloses 16 Nov, 202611 daysValue £60.00kSource Find a TenderWest Sussex County Council are seeking to and identify suitably qualified and interested organisations to obtain road condition data for the highway network for footways and remote cycleways during 2027.