Skip to content
Tenfell
Awarded contract
Published 02 Aug 2023

Fit Out - WP12.5 Architectural Metalwork - Old Oak Common (S4) Station

Balfour Beatty VINCI Systra JV

Key facts

Contract value
£10,000,000
Awarded
30 Apr 2025
Contract starts
26 May 2025
Contract ends
31 Jul 2029
Buyer type
Other public body

Description

WP12.5 Architectural Metalwork

Scope of work: OOC HS2 Station Architectural Metalwork Package (WP12.5) consists of the design for construction and manufacture, supply, installation and assurance of architectural metalwork to the front of house HS2 Station areas, the Great Western Main Line/ Conventional Station (GWML) and Shared Accommodation Building (SAB). The scope of this package includes the following key elements: • Steel and glazed balustrades, with integrated lighting. • Timber handrails, with integrated lighting. • Platform barriers. • Lighting columns and armatures.

Key deliverables will be: • Design Development: Prepare the design for construction and manufacture of architectural metalwork, including detailed plans, elevations, general arrangements, and fabrication drawings. These drawings should encompass all necessary interface and connection details, structural elements and ancillary elements to meet the prescribed performance requirements. • Samples and Prototypes: Provide samples, prototypes, visual mock-ups, and benchmarks as deemed necessary to ensure compliance with design and quality standards. • Material Supply and Installation: Supply all required materials, labour, supervision, plant, and equipment for the installation of architectural metalwork in accordance with the approved design. • Assurance and Certification: Generate and supply comprehensive assurance documentation for architectural metalwork installations, including testing as required. • Coordination: Ensure coordination of architectural metalwork installations with various substrates, and other finishes to achieve integration within the overall project.

By executing the works diligently and adhering to the prescribed specifications, our aim is to deliver a high-quality architectural metalwork package that meets the requirements and contributes to the success of the Old Oak Common HS2 Station project.

About the buyer's selection process: Respondents to this opportunity should be advised that shortlisted applicants will be invited to tender through an external ERP system.

The exact scoring criteria are currently being developed by BBVS, and shortlisted suppliers will be invited to register for the ERP system in due course.

What is clear at this stage is that tenders will be scored competitively across a range of criteria, such as, but not limited to: HSEQ, Commercial, Programme, Methodology (particularly with working in a track environment).

About the buyer: In 2018, Balfour Beatty, VINCI and SYSTRA (BBVS) created a strategic alliance to deliver major infrastructure projects for HS2, in particular the Terminus at Old Oak Common.

BBVS are committed to delivering this project to align with the key principles of Integrity, Leadership, Respect & Safety.

Additional information: No Documentation is included at this point.

Categories (CPV)

Similar open tenders

About Balfour Beatty VINCI Systra JV

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Published by the buyer on Contracts Finder (Open Government Licence v3.0). Always read the original notice before responding.