WP4059a - New Art Gallery - Heat Decarbonisation - AWARD
Walsall Council e-Tendering · West Midlands
Key facts
- Contract value
- £801,885
- Awarded
- 19 Mar 2025
- Contract starts
- 10 Mar 2025
- Contract ends
- 31 Jul 2025
- Procedure
- Other -
- Buyer type
- Local government
- Source
- Contracts Finder
Awarded to
| Supplier | Value |
|---|---|
| Seddon Construction Limited | £801,885 |
Description
The Council is looking to appoint a single competent principal contractor to undertake decarbonisation works at the New Art Gallery Walsall. The project comprises of the following items to be partly funded by Salix via the PSDS 3c:
o Strip out and removal of the existing gas boilers. o Replacement of the inverted roof system with new warm roof deck on the 4th floor to provide a 20-year insurance back warranty. o Installation of new handrail system to the roof and bigfoot system for ASHPs. o Installation of new ASHP and Water to Water Heat Pumps. o Associated fire-stopping works.
The Council procured expert consultants to undertake carbon auditing across its estate including leisure facilities. For the New Art Gallery the following measures have been recommended, funding permitting:
o Installation of an air source heat pump. o Installation of secondary glazing. o Installation of tap flow restrictors. o AtkinsR?alis have made a strategic assessment of the economic and sustainable approach which is the installation of a renewable heating system (air source heat pump). The proposal is to install:
- Install a Mitsubishi NX-N Range air source heat pump with a 400v 3ph 50 Hz Phase Power plus DOL starter. - Install an accompanying Mitsubishi EW-HT range water-to-water heat pump with a 400v 3ph 50Hz Phase Power output. - A structural survey has been undertaken identifying the lower roof of the Gallery as being the only suitable location for the air source heat pump to be installed. The loading of the unit is to be spread using a Big Foot load spreading system. - The annual forecast energy savings following the works is estimated to be 270,684kWh. - Reduce the carbon emissions by 86.04tCO2 per year based on the Salix PSDS 3C application. - The investment will provide an immediate impact on the heating and energy demands of the Gallery.
Programme Designs provided within this tender are up to RIBA Stage 4.
The Council aim to award the contract by 7th March 2025 and works to be completed at the earliest opportunity subject the manufacturing lead times/weather conditions, envisaged July 2025.
The route to market being used is a direct award under the Pagabo Decarbonisation Solutions framework. The framework is 0.25%, which is charged monthly to the winning contractor.
Budget Circa ?798,000.00 of which ?332,583.99 comprises of grant funding provided by Salix.
Under the grant funding terms, all grant funding must be drawn down and spent by the 31st of March 2025.
Insurance Requirements o Employers' liability - a minimum of ?5 million. o Public liability - a minimum of ?10 million. o Professional indemnity - a minimum of ?1 million
Procurement Timetable Set out below is the proposed procurement timetable. This is intended as a guide and, whilst the Council does not intend to depart from the timetable, i...
Categories (CPV)
Similar open tenders
Roof replacement and associated works at Cork College of FET St Gobans College, Seskin, Bantry, Co Cork.
Location: IrelandBuyer: Cork Education and Training Board
Open tenderCloses 20 Nov, 202615 daysValue €2.00MSource TEDRoof replacement works, rooflights replacement, high level windows replacement, and all associated works.
Cuireadh chun Tairisceana: láithreán a dhiúscairt chuig Comhlacht Ceadaithe Tithíochta do thithíocht inacmhainne/Invitation to Tender: site disposal to an Approved Housing Body for affordable housing
Location: IrelandBuyer: Údarás Na Gaeltachta
Open tenderCloses 4 Dec, 202629 daysValue €150.00KSource TEDCuireadh chun Tairisceana chun láithreán a dhiúscairt go dtí Comhlacht Ceadaithe Tithíochta a d’fhéadfaí cóiríocht chónaithe inacmhainne, a d’fhéadfaí a thógáil, a dhíol agus a léasú, a chur ar fáil do Chainteoirí Gaeilge sna Doirí Beaga (Gaoth Dobhair), Co. Dhún na nGall d’Údarás na Gaeltachta. Invitation to Tender fo
Multi Party Framework Agreement for Minor Repair and Maintenance Works to occupied properties owned or managed by Dublin City Council
Location: IrelandBuyer: Dublin City Council
Open tenderCloses 4 Dec, 202629 daysValue €48.00MSource TEDDublin City Council Housing Maintenance Section manages the repair and maintenance of the council's residential housing stock. Housing Maintenance Section serves 11 Housing Areas: Ballymun-Finglas, Artane-Whitehall, Donaghmede, Clontarf, Cabra-Glasnevin, North Inner City, South West Inner City, South East Inner City, B
Stoke Road, Henlade
Location: United KingdomBuyer: Stonewater Limited
Open tenderCloses 16 Dec, 202641 daysValue £10.30mSource Find a TenderThis procurement exercise is to support the delivery of 39 mixed-tenure homes on a greenfield site off Stoke Road, Henlade TA3 5FF, south of Henlade Close (Phase 1). This will extend the existing 26-home affordable housing development built nearly 10 years ago, where many homes are now privately owned. The new scheme i
TENDER FOR CAPITAL YOUTH PROGRAMME (ENNISKILLEN ROUND O) - 2627 CP 067N
Location: Northern IrelandBuyer: Fermanagh and Omagh District Council
Open tenderCloses 25 Nov, 202620 daysValue £162.00kSource Find a TenderFermanagh and Omagh District Council invite tenders to provide the works for provision and installation of Teen shelters, Pergola, Trim Trail Equipment, Spacenet, Hammock, Safety Surfacing, Outdoor Table Tennis and DJ Post and associated works at Round O, Enniskillen. This is a funded project through the PEACEPLUS Loca
Kitchen Replacement Programme
Location: Yorkshire and the HumberBuyer: VICO HOMES LIMITED
Open tenderCloses 18 Dec, 202643 daysValue £110.18mSource Find a TenderThe specifications support the planned replacement of kitchens in Vico Homes properties and are intended to form schedules to the contract. The base requirement is a like-for-like replacement of existing kitchens ('kitchen out, kitchen in'), subject always to statutory compliance, safety, resident need and any approved