Skip to content
Tenfell
Awarded contract
Published 30 Aug 2026

UCC Kane Science Building Redevelopment - Construction Consultancy Team - Prequalification Stage

University College Cork · Ireland

Key facts

Contract value
€2,767,179
Awarded
28 Jul 2026
Contract starts
28 Jul 2026
Contract ends
28 Oct 2032
Procedure
Restricted procedure
Buyer type
Education

Awarded to

SupplierValue
Henry J Lyons€2,767,179

Description

This tender is to appoint an Architect led Construction Consultancy Team for UCC Kane Science Building Redevelopment . This stage involves the shortlisting of Candidates on the basis of the selection criteria set out in this document. The intention is that a maximum of Six Candidates will be shortlisted and invited to the Tender Stage of the competition. The successful tenderer will be required to provide the full range of consultancy services for the delivery of the Contract including but not limited to the following a) Architectural Services (including DAC, Planning and Landscaping Design Services), b) Civil,Structural Engineering Services (including Transport, Mobility, Environmental and Façade Engineering Services)c) Fire Engineering Services d) Mechanical and Electrical Engineering Services (Including BREEAM, Sustainability Specialist and Process Engineering), e)Project Supervisor Design Process (PSDP), f)Employers Representative (Dedicated Role) g)Information Manager. Note Quantity Surveying Services will be by separate appointment by UCC . The existing Kane Science Building is a multi storey building consisting of 5 floors above ground, including plant area and 1 basement level below ground. The total floor area of the building is circa 14,150 sq m.The Kane Science Building, located centrally on the main campus of University College Cork (UCC), has been the heart of Science, Technology, Engineering and Mathematics (STEM) in Cork since 1971. The Kane Science Building opened in 1971 and, despite some localised refurbishment over the last 50 years, is in need of urgent and significant investment in its fabric and core infrastructure.The refurbishment of the Kane Science Building is identified as a key priority in the University’s Strategic Plan 2023 to 2028 Securing our Future.The primary purpose for the Kane Science Building Refurbishment is to reduce the energy consumed and emissions by the current building and services, to repurpose areas, to upgrade selected areas, and to extend the life of an existing building.

Categories (CPV)

Similar open tenders

About University College Cork

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Their other open tenders

Published by the buyer on TED (Tenders Electronic Daily) (EU open data (Decision 2011/833/EU)). Always read the original notice before responding.