Skip to content
Tenfell
Closed tender
Published 23 May 2024

Contract 15 - Supply of Building Material 2024

North Tyneside Council · North East

Key facts

Estimated value
£2,200,000
Closing date
25 Jun 2024
Contract starts
31 Aug 2024
Contract ends
31 Aug 2026
Procedure
Open procedure (above threshold)
Buyer type
Local government

Description

This Framework Contract will ensure availability of suitable Suppliers for the supply ofVarious Building materials goods required and as detailed in the Specification included within the Tender Documents. It is anticipated the Contract will commence on 1st September 2024. The Framework is for an initial 24 month period with the option to extend for up to a further two, twelve month periods. A mini competition will be carried out annually between the successful Contractors which may result in re-ranking of suppliers. The Successfully awarded Contractors will be required to work together with North Tyneside Council (the Authority) to drive improvements and support the aims and ambitions of the Contract. The Framework consists of the following 9 lots and a maximum of 3 Contractors will be appointed on each Lot. There is no limit to the number of Lots you can bid for, where you are unable to provide a price for a product, the Authority will apply the highest price submitted from all bids submitted. Tenderers (Bidders) must price at least 80% of each Lot being applied for, the Lots are as follows:

Lot 1 - Bricks, Sand & Cement, Plaster, Plasterboard,and Small Aggregates

Lot 2 - Floor and Wall Tiles

Lot 3 - UPVC Trim

Lot 4 - Tools

Lot 5 - Hardware

Lot 6 - Gas Bottles

Lot 7 -Sundries and Miscellaneous

Lot 8 -Roofing Materials

Lot 9 -Sealants and Adhesives

Interested bidders must access the Tender documents for further information, which are available to download immediately in the electronic tendering Portal, NEPO Portal, the link to the NEPO Portal is in additional information futher below

Additional information: Award Criteria The full detail's of the award criteria are included in the Tender Documents

Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework.

Number of Successful Tenderers The maximum number of Contractors to be awarded on the Framework = 3 (three) per Lot

The link to the NEPO Portal is further below =

Categories (CPV)

Similar open tenders

About North Tyneside Council

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Published by the buyer on Contracts Finder (Open Government Licence v3.0). Always read the original notice before responding.