Closed tender
Published 13 Nov 2024

Compressor and air ring system

PENZANCE DRY DOCK (2009) LIMITED

Key facts

Estimated value
£55,000
Closing date
02 Dec 2024
Contract starts
01 Feb 2025
Contract ends
31 Mar 2025
Procedure
Open procedure (below threshold)
Buyer type
Other public body

Description

Penzance Dry Dock (PDD) is famously steeped in history, currently being the oldest operational dry dock of its type in Europe but requires drastic investment after decades of neglect and dilapidations. While the surrounding shipyards, across the county and country have seen investment, PDD has slipped through the net time and time again.

PDD plans to complete a large refit by March 2025. PDD will become the engineering powerhouse that it once was, but with more abilities than ever before. This facility has primally been ship repair only, but now we are supporting multiple areas of the market, ship repair, ship building, mass fabrication and most importantly training and skill development.

This capital investment, part-funded by the UK Government through the UK Shared Prosperity Fund, will see the site brought up to an even playing field with the rest of industry, with new, safer lifting systems and the dilapidations being rectified. We will see our efficiency drastically increased which in turn will assist in reducing our carbon footprint.

Penzance Dry Docks is seeking the supply, installation and commissioning of the air ring arrangement at Penzance Dry Dock.

Specification included as an attachment.

Site visit highly recommended.

Categories (CPV)

Similar open tenders

About PENZANCE DRY DOCK (2009) LIMITED

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Published by the buyer on Contracts Finder (Open Government Licence v3.0). Always read the original notice before responding.