Skip to content
Tenfell
Closed tender
Published 16 Jun 2025

Developing a tool for electric power system cost simulation in the Philippines

PALLADIUM INTERNATIONAL LIMITED

Key facts

Estimated value
£144,000
Closing date
07 Jul 2025
Contract starts
17 Aug 2025
Contract ends
17 Feb 2026
Procedure
Open procedure (above threshold)
Buyer type
Other public body

Description

The Philippines has set ambitious targets to increase the share of renewable energy in its power generation mix to 50% by 2040. As the country expands its use of clean energy sources such as solar, wind, and hydropower, regulatory bodies require more advanced tools to assess the system-wide and consumer-level impacts of this transition.

This RFQ seeks a supplier to support the Energy Regulatory Commission (ERC) in developing a tailored power system cost simulation tool. The tool will enable ERC to analyze the impacts of different renewable energy scenarios on overall system costs and electricity tariffs, helping to guide evidence-based regulatory decisions.

The supplier will work closely with ERC to co-design the tool, gather and validate data, run scenario simulations, and deliver training workshops. The intervention aims to strengthen ERC's capacity to assess future renewable energy investments and support an inclusive, sustainable energy transition aligned with national policy goals.

Categories (CPV)

Similar open tenders

About PALLADIUM INTERNATIONAL LIMITED

Their tenders, awards, contracts coming up for renewal, decision makers and committee papers.

View buyer profile

Published by the buyer on Contracts Finder (Open Government Licence v3.0). Always read the original notice before responding.