GB-Edinburgh: Refurbishment of Fife Ness Lighthouse
Northern Lighthouse Board · Scotland
Key facts
- Contract value
- £112,874
- Awarded
- 19 Aug 2024
- Contract starts
- 29 Aug 2024
- Contract ends
- 31 Mar 2025
- Procedure
- Not specified
- Buyer type
- Central government
- Source
- Contracts Finder
Awarded to
| Supplier | Value |
|---|---|
| R. S. Merriman Ltd | £112,874 |
Description
Painting work of buildings. Fencing, railing and safety equipment installation work. Fife Ness Lighthouse is at an elevation of 12m and a position of 56º 16.17' N, 02º 35.10' W. The character of the light is flashing white and red every 10 seconds with a range of white 21miles and red 20 miles. The lighthouse sits on a rock outcrop, which falls approximately 3m down to the shore to the south around the lightroom area. The station is bounded by a 2m concrete post and mesh fence topped with 3 layers of barbed wire. There is a tarmac track from the entrance gate up to the station entrance. The Lighthouse is a single storey building that consists of lantern room, control room and battery room. The light was first established in 1975. The proposed works principally involves the repair of and defective items and application of decorative / protective coatings to all external /internal surfaces of the structure. More specifically, the main items of project work are as listed below:- 1. Carry plant, tools and materials to site. 2. Ensure contractors own site welfare facilities accessible. 3. Carry out an Asbestos Refurbishment / Demolition Survey on the structure prior to the commencement of any work. The survey, sample collection and sample analysis must be carried by a UKAS accredited contractor in accordance with ISO 17020, ISO 17025 and Health & Safety Executive Guidance Notes; HSG 248, Asbestos: The analysts' guide for sampling, analysis and clearance procedures" and HSG264, Asbestos: The survey guide. A copy of the report must be issued to the Engineer prior to work commencement. 4. All licensed removal work must be carried out by Asbestos Removal Contractors who are in possession of a current asbestos license issued by the Health and Safety Executive and who are members of the Asbestos Removal Contractors Association (ARCA). Asbestos Removal Contractors must be assessed in advance by the NLB QHSE department. 5. External work (Lighthouse Station) Wash down prepare and paint externally. Replace entire security fence. Remove obsolete emergency optic. Minor building refurbishment works. 6. Internal work (Lighthouse Station) Washdown, prepare and paint internals of lighthouse. Minor building refurbishment works. 7. Remove rubbish off site on a regular basis, photographs of welfare facilities to be provide to NLB at the start and end of each trip to ensure basic hygiene levels are met. 8. The Contractor must supply the NLB Project Leader with 'as-built' drawings and information for incorporation within NLB Operational and Maintenance documentation, which includes the Health and Safety file in line with current CDM Regulations. Programme The contractor must submit a works programme, at tender stage with a proposed start date for the sequence of works within this project. It is anticipated that the programme of scheduled works will start in July/August 2024 and take place over a period of 8 weeks.
Categories (CPV)
Similar open tenders
Construction of New Fire Training Building at the Joint Training Centre
Location: East MidlandsBuyer: The Police and Crime Commissioner for Derbyshire
Open tenderCloses 17 Dec, 202642 daysValue £3.00mSource Find a TenderDerbyshire Police Fire Partnership LLP is seeking to award a Contract for the provision of the Construction of a New Fire Training Building at the Joint Training Centre, as detailed in the Invitation to Tender Statement of Requirements.
Courts to Canopy – a Nature Restoration Project
Location: WalesBuyer: Neath Port Talbot County Borough Council
Open tenderCloses 27 Nov, 202622 daysValue £95.00kSource Find a Tender1.1 Introduction Neath Port Talbot County Borough Council (the “Council”) is seeking to appoint the services of a contractor, to enable the transformation of a local Tennis Courts in the area of King George V Pontardawe. The old tennis courts will become a space for people and nature introducing a meadow, tree Planting
PLACE1155H Lime Tree Wood (Beeley) Landslip- Repair Works
Location: West MidlandsBuyer: Derbyshire County Council
Open tenderCloses 5 Dec, 202630 daysValue £1.44mSource Find a TenderFor design and construction of a new wall to retain the carriageway, reconstruction of road pavement and highway boundary wall, earthworks reinstatement and associated works Location : Chesterfield Road at OS Grid ref. SK 27586 67431 east of the village of Beeley in Derbyshire (DE4 2NS).
Fusion21 Construction & Refurbishment Framework (2027-31)
Location: North WestBuyer: Fusion 21 Foundation
Open tenderCloses 8 Jan, 20272 monthsValue £1.00bnSource Find a TenderFusion21 is establishing a 4-year Construction and Refurbishment Framework. The framework will cover the provision of construction and refurbishment works for participating contracting authorities across the United Kingdom, in accordance with the objectives and requirements of the Procurement Act 2023 (PA23). Prelimina
Frimley Lodge Car Park Project
Location: South EastBuyer: Surrey Heath Borough Council
Open tenderCloses 8 Dec, 202633 daysValue £1.21mSource Find a TenderFrimley Lodge Car Park Project - reconstruction of the Main Car Park and Main Access Road, resurfacing of Main Entrance Road; includes new drainage, signage, lighting and power for 2 no. electric vehicle charging points (EVCP) and the infrastructure ducting only for the possible future expansion of EVCPs and CCTV provi
CS6096 School Decarbonisation - Bonner Mile End Main Works Contractor
Location: LondonBuyer: London Borough of Tower Hamlets
Open tenderCloses 30 Nov, 202625 daysValue £1.36mSource Find a TenderThis procurement aims to appoint a main works contractor via an Open Procedure tender to deliver decarbonisation and comfort improvement works at the Grade II listed Primary School, Bonner Mile End, located in Mile End, in the London Borough of Tower Hamlets. The school currently faces significant thermal discomfort -